WELCOME TO MY BLOG

KENALI dan Dalami

Popular posts

Laman

Diberdayakan oleh Blogger.
Geo Explora On Rabu, 10 April 2013

-->


JACRO EX 175 Winch (PORTABLE DRILLING RIG)
Unit Bor


No
Description
QTY
UNIT
1
Jacro-EX 175 Winch (portable drill rig)



System,multi purpose with vertical hole,hydraulic Boom type, EX 175 Winch (portable drilling Rig), feed 1,5 mtr skid mounted hydraulic top drive drill,mast 3,5 meter,easy to carry,knock down system, moving can do by winch,control panel,mounted on skid base hydraulic head, winch cable (10mm)=25 mtr.
1
SET

Power Pack



Engine Power : Yanmar TF 155 R (15,5 HP)



Hidraulic tank:,SAE10,With Hidraulic Control



Oil Cooler:OR-100



Unit Control Device



Head Control Valve 2 bank.3/4” for up-down,winch,
Head Control Valve 1 Bank ¾” for rotary




Reliev valve:for adjustment pressure gauge



Break valve:



Unit Power Device



Rotation.Head Motor Orbit



Up down.Gear Motor Orbit



Hydraulic Winch motor Orbit


With gear system 2:1


Drill Head:Gear box rotary type gear ratio 2:1


2
Drilling PUMP



Pompa SC-120, 3 plungers stainless steel type,3 set valve inlet, Capacity 76 - 133 lit/min Power required 13,4 - 20 kw / 10 - 15, Plunger 33,5 mm x 3 Revolution 300 - 600 rpm, Maximum pressure 50 kg/cm,engine power by  Dongfeng R185 (10 Hp)
1
SET
3
Suplay Pump



Pompa SC-45, 3 plunger stainless steel type,3 set valve inlet, Capacity 22 - 59 lit/min Power required 13,4 - 20 kw / 10 - 15 Plunger 33,5 x 3 Revolution 300- 600 rpm Maximum pressure 50 kg/cm, engine power by Dongfeng R175 (7 Hp)
1
SET




II. ACCESSORIES/DOWN HOLE EQUIPMENT UNTUK KEDALAMAN 100 METER

No.
Description
QTY
1.
Pipa/Rod AW Upset to BW
100 mtr
2.
Corebarrel NMLC /NQ Konvensional Assy, terdiri atas :
1 set

Core Barrel Head NMLC    / NQ                           
3 Pcs

Outer Core  Barrel NMLC /NQ                   
3 Pcs

Inner Core  Barrel NMLC /NQ                              
3 Pcs

Splitter Core  Barrel NMLC  /NQ                       
4 set

Core Lifter NMLC/NQ
1 Pcs

Core Lifter NMLC/NQ
1 Pcs

Stop ring NMLC /NQ                                         
3 Pcs

BOP NMLC /NQ
1 Pcs

Stabilizer NMLC /NQ
1Pcs
3.
Core Barrel Single 73 mm                                
3 set
4.
Casing HQ
15 meter
5.
Diamond Core Bit NMLC/NQ                                 
4Pcs
6.
Reamer Shell Diamond NMLC/NQ
1 Pcs
7.
Water Swivel                                                     
4 Pcs
8.
Hoisting Plug BW
1 Pcs
9.
Pendorong Contoh + Selang
1 set
10.
Tungsten Core Bit NMLC/NQ                    
6 Pcs
11.
Tungsten Core Bit Single 73                              
3 Pcs
12.
TungstenWing bit 76 mm                                    
6 Pcs
13.
Casing Shoe Tungsten HQ                                  
4 Pcs
14.
Kunci Permali NMLC /NQ                              
3 set
15.
Sub box BW to HQ pin
3 Pcs
16.
Selang Tekan
5 meter
17.
Selang PE ¾” 200m
1 roll
18.
Selang Hisap
2 set
19.
Selang Oil Cooler                                                 
2 set
20.
Safety Fork                                                            
3 pcs
21.
Kunci Pipa 24 “                                                    
6 Pcs
22.
Kunci Pipa dia 36 “                                              
6 Pcs
23.
Kunci Inggris                                                        
3 set
24.
Kunci Pas-ring                                                       
3set
25.
Obeng ( +, - )                                                          
4 set
26.
Tang
1 Pcs
27.
Kunci “L                                                                  
3 set
28.
Palu 1 kg
1 Pcs
29.
Linggis             
1 Pcs`
30.
Gergaji Besi                                                           
2Pcs
31.
Grease Pump
1 Pcs
32.
Cadangan Seal SC 120                                              
3 Set
33.
Cadangan Seal SC 45                                               
3 Set
34.
Cadangan asbes water swivel dan selotip                
3 Set
35.
Cadangan Sambungan Rantai                                  
2 Set


Unit tersebut ready stock, untuk pemesanan, uang muka yang dibayarkan adalah 30% dari harga. Pelunasan dilakukan setelah barang selesai, sebelum dikirim. Harga Unit, belum termasuk biaya packing, ongkos kirim, dan biaya pelatihan di luar bandung. Untuk Biaya Pelatihan diluar Bandung, dikenakan Biaya UHP Instruktur/Juru Bor sebesar Rp. 250.000,-/hari, biaya akomodasi dan transportasi Bandung-Lokasi.

Untuk info lebih lanjut dapt menghubungi 081 394882569 atau 022 91228569

atau kirim email ke geo.explora@ymail.com

atau kunjungi website kami di www.mesinbortambang.com

{ 2 komentar... read them below or Comment }

  1. Klu mesin bor ini kemampuan pemboran inti (NQ misalnya) bisa berapa meter kedalamannya?

    Berapa harga satu unitnya lengkap dengan pompa, drill rod, hose dsb (OTR lah pokoknya)?

    BalasHapus
  2. Klu mesin bor ini kemampuan pemboran inti (NQ misalnya) bisa berapa meter kedalamannya?

    Berapa harga satu unitnya lengkap dengan pompa, drill rod, hose dsb (OTR lah pokoknya)?

    BalasHapus